Walkway
The square in front of the Rotterdam Market Hall has been transformed in 2015, commissioned by the City of Rotterdam. A walkway has been constructed to cross over the deepened bicycle shed, which connects the Blaak with the market. A telescopic crane with a lifting capacity of 400 tons was needed to get the 30-tonne bridge in place. The bridge was finished with natural stone pavement afterwards.
The steel construction is protected for an extreme long time by SteelKote coating. Mourik B.V. aims for sustainable production and looks for ways to do so in all the links of the chain. The low environmental impact of SteelKote coatings makes the product a perfect match for this contractor.
Download casestudie
Client: |
City of Rotterdam |
Contractor: | Construction company Mourik B.V. |
Architect: | Herschbach-Architecten |
Steel construction: |
Construction company Mourik B.V. |
Application coating: | Viets Staalconstructie |
Date of construction: | February 2016 |
Applicated coating system:
Layer 1: | 803 SteelKote EP AC+ | 80μm |
Layer 2: | 806 SteelKote EP Miox | 100μm |
Layer 3: | 808 SteelKote PC HS UV+ | 80μm |
Total: | 260µm |