Walkway

Walkway

The square in front of the Rotterdam Market Hall has been transformed in 2015, commissioned by the City of Rotterdam. A walkway has been constructed to cross over the deepened bicycle shed, which connects the Blaak with the market. A telescopic crane with a lifting capacity of 400 tons was needed to get the 30-tonne bridge in place. The bridge was finished with natural stone pavement afterwards.

The steel construction is protected for an extreme long time by SteelKote coating. Mourik B.V. aims for sustainable production and looks for ways to do so in all the links of the chain. The low environmental impact of SteelKote coatings makes the product a perfect match for this contractor.

Download casestudie

Client:

City of Rotterdam
Contractor: Construction company Mourik B.V.
Architect: Herschbach-Architecten
Steel construction:

Construction company Mourik B.V.

Application coating: Viets Staalconstructie
Date of construction: February 2016

Applicated coating system:

Layer 1: 803 SteelKote EP AC+ 80μm
Layer 2: 806 SteelKote EP Miox 100μm
Layer 3: 808 SteelKote PC HS UV+ 80μm
Total:   260µm